Scrolly background

NTRAF section 2 and section 3.5 / Prototype development

What TRL 4 means

Basic technological components are integrated to establish that they will work together. TRL 4–6 is the bridge from scientific research to engineering.

Criteria reviewers look for

  • Available components work together in a lab setup.
  • Key manufacturing processes are identified.
  • Low-fidelity system integration has been completed.

Evidence examples

  • Component validation report
  • Breadboard test report
  • Preliminary FMEA

Next action

Move from a lab setup to a higher-fidelity prototype with realistic interfaces.

Map context

Where TRL 4 sits

TRL 1-3

Signal

Research, concept, and proof-of-concept evidence.

TRL 4-6

Forge

Lab validation, prototypes, test loops, and pilot evidence.

TRL 7-9

Flight

Operational validation, qualification, and deployment readiness.